PROJECT
INCORPORATING COLD CHAIN
Sheeting going up.
For the refrigeration design, the number one priority of this
project was to reduce operational costs while keeping capital
costs within realistic constraints.
1
1. A plant with a view: the multiplex
plant is located on a mezzanine
platform 8m up off the ground.
2. The controls for the Schneider/
Greenwave solar system.
3. All compressors are equipped with
ABB soft starters to reduce peak
kVA draw under start-up.
2
LIST OF PROFESSIONALS
Owner / Developer Uwe Schmidthaus and James Ross Stewart
Architect / Designer LMH Designs Project manager Caroline Schmidthaus Consulting engineer Electrical, mechanical,
wet services, and civil Wimpie de Beer, Pr Eng
Contractors Main building Viva Engineering and
Boyens Builders
HVAC&R Lutz Refrigeration
Insulation Isowall
Wet services Piri
Electrical I P M
Solar Greenwave
Multiplex Lutz Refrigeration
Evaporators Colcoil
Cooling tower Evapco
Controls Carel
Dehumidifier Bry-Air
Mobile racking Barpro
Dock levellers Maxiflex
Solar system Schneider, Greenwave Energy
Compressors GEA
Soft starters ABB
Power factor correction Schneider
3
Product suppliers