Cold Link Africa July/August 2017 | Page 29

PROJECT INCORPORATING COLD CHAIN Rigging the impressive multiplex system. Inside the airlock. Storax mobile racking has maximised storage capacity. for some flexibility, with picking being allowed for if required. The outcome is that this facility can hold 3 650 pallets within its roughly 25 000m 2 volume. For the refrigeration design, the number one priority of this project was to reduce operational costs while keeping capital costs within realistic constraints. During the design stage, various industry-leading contractors were invited to tender their own specification and design with a brief to bring to the table what they believed would best match these criteria. Quotes were requested from both freon and ammonia contractors with no allegiance to either refrigerant — only a view to compare on the various levels what would best suit a facility like this. SYSTEM DESCRIPTION The basic description of this refrigeration system is a 250kW water-cooled freon multiplex system. The multiplex plant is located on a mezzanine platform 8m up off the ground, to reduce the pumping head required to get the refrigerant Continued on page 31 Run-off water from the storage tanks are used to water the lawn and two tanks are used for saving water. COLD LINK AFRICA • July | August 2017 www.coldlinkafrica.co.za 29