Cold Link Africa January/February 2019 | Page 11

PROJECT INCORPORATING COLD CHAIN 1 3 2 1. +2°C cascade chillers and accumulator vessels. 2. A look inside the impressive Sagamu Brewery. 3. Condenser area. List of professionals Owner   AB InBev Developer AB InBev Architect / Designer  PPS Architects Project manager   Royal Haskoning DHV Electrical WSP Group Africa Mechanical WSP Group Africa Wet services WSP Group Africa Structural Aurecon Refrigeration plant Alectia Main building Vita Construction HVAC&R Emtech MV Electrical WSP Group Africa Refrigeration WSP Group Africa NH 3 compressors GEA Africa Chiller plate heat exchanger GEA Africa NH 3 vessels D&D Fabrication Glycol pumps Grundfoss Condensers BAC NH 3 valves Hansen, Danfoss Air purger Hansen Variable speed drives (VSD) Danfoss the system rapidly so as to not affect PLC Siemens the beer quality. Ammonia skid manufacture MRE Industrial Refrigeration Glycol skid manufacture Charlson Pumps Consulting engineer The swing/backup compressor was tight and was further affected by installed to ensure that the plant does the civil delays on site. To limit the not loose capacity should one of the time required on site, the various compressors fail or need to undergo refrigeration packages were pre- maintenance. manufactured in South Africa by local Contractors contractors MRE Industrial Refrigeration Condenser plant and Charlson Pumps and then shipped The condenser plant comprised four as complete skid packages. evaporative condensers from BAC, a Due to various delays, the time liquid receiver, mechanical auto purger, allocated for commissioning was and an automatic water dosing system. very limited and as a result, various Each of the condensers’ four fans was parts of the system were only fitted with variable speed drives, which commissioned during the first brew were controlled by means of the plant’s process, putting a huge amount condensing pressure to minimise the of pressure on the commissioning electrical usage of the plant. engineers to resolve problems with CHALLENGES Like with most construction projects, the timeline for the build was extremely But in the end, it all came together. CLA Suppliers COLD LINK AFRICA • January/February 2019 www.coldlinkafrica.co.za 11