CIS 554 RANK Learn Do Live /cis554rank.com CIS 554 RANK Learn Do Live /cis554rank.com | Page 4

b. Create a WBS for the scope of the project. Note: The WBS must be in indented format as shown in Figure 5.5B in Chapter 5 of the text. c. Analyze the various activities required for this project and provide an estimate of duration for each activity based on the number of resources available for the project. Include assumptions and basis for each estimate. d. Recommend the estimation technique that should be used for each activity (i.e., PERT, Delphi, Analogy, Expert Judgment, or Rule of Thumb). e. Determine the major milestones that the project will encounter. f. Describe the logical sequence of planned activities required to achieve the project and analyze how monitoring durations on the critical path influence the success of the project. Section 1 of your assignment must follow these formatting requirements:  Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.