CIS 554 RANK Learn Do Live /cis554rank.com CIS 554 RANK Learn Do Live /cis554rank.com | Page 4
b. Create a WBS for the scope of the project. Note: The WBS must be
in indented format
as shown in Figure 5.5B in Chapter 5 of the text.
c. Analyze the various activities required for this project and provide
an estimate of duration
for each activity based on the number of resources available for the
project. Include
assumptions and basis for each estimate.
d. Recommend the estimation technique that should be used for each
activity (i.e., PERT,
Delphi, Analogy, Expert Judgment, or Rule of Thumb).
e. Determine the major milestones that the project will encounter.
f. Describe the logical sequence of planned activities required to
achieve the project and
analyze how monitoring durations on the critical path influence the
success of the project.
Section 1 of your assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman font (size 12),
with one-inch margins on all
sides; citations and references must follow APA or school-specific
format. Check with your
professor for any additional instructions.