CIS 554 RANK Extraordinary Life/cis554rank.com CIS 554 RANK Extraordinary Life/cis554rank.com | Page 4

c. Analyze the various activities required for this project and provide an estimate of duration
for each activity based on the number of resources available for the project. Include
assumptions and basis for each estimate.
d. Recommend the estimation technique that should be used for each activity( i. e., PERT,
Delphi, Analogy, Expert Judgment, or Rule of Thumb). e. Determine the major milestones that the project will encounter.
f. Describe the logical sequence of planned activities required to achieve the project and
analyze how monitoring durations on the critical path influence the success of the project.
Section 1 of your assignment must follow these formatting requirements:
� Be typed, double spaced, using Times New Roman font( size 12), with one-inch margins on all
sides; citations and references must follow APA or school-specific format. Check with your
professor for any additional instructions.
� Include a cover page containing the title of the assignment, the student’ s name, the professor’ s
name, the course title, and the date. The cover page and the reference page are not included in