b. Define a work breakdown structure and describe the methodology behind constructing
one.
Deliverable 2: WBS (MS Project or open source equivalent)
2. Use Microsoft Project to create a WBS which:
a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.
b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.
c. Contains Work Breakdown Structure Code for each task.
d. Presents a duration estimate for each task which results in a duration estimate for the
project not to exceed the requirements described in the overview.
Deliverable one (1) of your assignment must follow these formatting requirements:
·
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on
all sides; citations and references must follow APA or school-specific format. Check with your
professor for any additional instructions.
·
Include a cover page containing the title of the assignment, the student’s name, the
professor’s name, the course title, and the date. The cover page and the reference page are not
included in the required assignment page length.
The specific course learning outcomes associated with this assignment are:
·
Identify how project management improves the success of information technology
projects.