Write a two to three (2-3) page paper in which you:
1. Compare and contrast the information that one receives from a
Gantt chart, versus that of a PERT diagram.
2. Examine the advantages of using a Gantt chart over a PERT
chart and vice versa. Determine when it is appropriate to use one over
the other. Justify your response.
3.
Assess the importance of the critical path in project management.
4. Insert the screenshots of the Gantt and PERT charts you created
based on the provided criteria. Elaborate on the status of the VoIP
deployment project based on the updated information. Note: The
graphical representations do not count toward the overall page
requirement.
5. Use at least two (2) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
·
Be typed, double spaced, using Times New Roman font (size 12),
with one-inch margins on all sides; citations and references must
follow APA or school-specific format. Check with your professor for
any additional instructions.
·
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the
required assignment page length.
·
Import completed diagrams, charts, or screenshots into the Word
document before the paper is submitted.