CIS 517 RANK Great Stories/cis517rank.com CIS 517 RANK Great Stories/cis517rank.com | Page 5
The cover page and the reference page are not included in the
required assignment page length.
===========================================================
CIS 517 Week 5 Assignment 3 Voip Part 1 (Work Breakdown
Structure) (2 Papers)
FOR MORE CLASSES VISIT
www.cis517rank.com
This Tutorial contains 2 Papers
This assignment contains two (2) deliverables: a summary document
to be delivered in a word processor document format and a Work
Breakdown Structure (WBS) to be delivered in a project file.
Overview
As the project manager for an IT department, you have been assigned
to manage the project of deploying a new VoIP phone system to the
company’s campus. The campus consists of three (3) different
buildings, each with twenty to fifty (20 to 50) workstations. The project
must be completed in ninety (90) calendar days starting on November
1.
Deliverable 1: Summary (MS Word or open source equivalent)