1. Write a one to two (1-2) page summary document in which
you:
a. Summarize the project requirements and other assumptions
(e.g., budget, human resources, workload, environmental
dependencies, etc.).
b. Define a work breakdown structure and describe the
methodology behind constructing one.
Deliverable 2: WBS (MS Project or open source equivalent)
2.
Use Microsoft Project to create a WBS which:
a. Contains at least five (5) main tasks, one for each of the
PMBOKĀ® process areas.
b. Contains at least sixty (60) line items distributed in ten (10) or
more work packages.
c. Contains Work Breakdown Structure Code for each task.
d. Presents a duration estimate for each task which results in a
duration estimate for the project not to exceed the requirements
described in the overview.