on day 60 of the project, it becomes evident that two (2) additional
engineers are needed to ensure on-time completion of the project.
The engineers cost $25,000 each and a fee of $120,000 is issued by
the legacy provider. The probability of completing the project on
time is as follows: With the current personnel – 60%; With one (1)
engineer – 80%; With both engineers – 98%.
6. Explain the methodology utilized to create a decision tree and
recommend the appropriate action to take based on your decision
tree from criterion 5.
7. Use at least two (2) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality resources.
Your assignment must follow these formatting requirements:
·
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
·
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the
required assignment page length.
·
Include the decision tree created in your chosen software. The
completed decision tree must be imported into the Word document
before the paper is submitted.
The specific course learning outcomes associated with this
assignment are: