CIS 353 RANK Great Stories/cis353rank.com CIS 353 RANK Great Stories/cis353rank.com | страница 4
If there is a qualified candidate, the specialist will notify the candidate and
put a note in the database.
If a qualified candidate cannot be found or not immediately available, the
specialist notifies contract managers and recruiting department; the
recruiting department starts search outside immediately.
The recruiting department normally has thirty (30) days to find an outside
candidate and send the qualified candidates to the placement department
to review. If an internal qualified candidate is confirmed with his / her
availability, the confirmation will be sent to the arrangement department. In
the arrangement department, the candidate works with the specialists to
further confirm the placement details, such as starting date, location,
compensation (e.g., per diem), and travel arrangement. The final
confirmation will be sent to the client along with a billing schedule. If the
client agrees with the arrangement, he/she acknowledges the arrangement
with contract managers in the contract department. The contract manager
then puts a memo into its database and closes the request.
Note: You may create and / or assume all necessary assumptions needed
for the completion of this assignment.
1.
2.
3.
4.
5.
Write a three to four (3-4) page paper in which you:
Create a package diagram of the problem domain layer using the
communication diagrams and the CRUDE matrix through the use of
graphical tools in Microsoft Word or Visio, or an open source alternative
such as Dia. Note: The graphically depicted solution is not included in the
required page length.
Perform and explain the verification and validation walk-through of the
package diagram.
Create a set of invariants for attributes and relationships and add them to
the CRC cards for each class in the structural model using Object
Constraint Language (OCL).
List the classes in the structure model. Choose one (1) class and create a
contract for each method in that class. Note: Be sure to use OCL to specify
the preconditions and the post conditions.
Create a method specification for each method using both structured
English and activity diagram for the algorithm specification through the use
of graphical tools in Microsoft Word or Visio, or an open source alternative
such as Dia.Note: The graphically depicted solution is not included in the
required page length.