CIS 348 MENTOR Learn Do Live /cis348mentor.com CIS 348 MENTOR Learn Do Live /cis348mentor.com | Page 14
Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow
APA or school-specific format. Check with your professor for any
additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the
required assignment page length.
The specific course learning outcomes associated with this assignment
are:
Prepare strategies to manage project resources to include human
resources, capital equipment, and time.
Summarize the project procurement process including external
acquisition and outsourcing.
Design project execution activities including change control and
communicating project status.
Summarize methods to control technology projects through
information tracking and cost and change control techniques.
Evaluate the ethical issues in complex project environments.
Identify and plan communication strategies for project constituents
and stakeholders across global teams and those internal to the
organization.
Use technology and information resources to research issues in
information systems and technology.