CIS 348 MENTOR Career Path Begins/cis348mentor.com CIS 348 MENTOR Career Path Begins/cis348mentor.com | Page 7
Define a work breakdown structure and describe the methodology
behind constructing one.
Deliverable 2: WBS (MS Project or open source equivalent)
Use Microsoft Project or an open source equivalent to create a WBS
which addresses the following:
Contain at least five (5) main tasks, one (1) for each of the PMBOK®
process areas.
Contain at least thirty (30) line items distributed in five (5) or more
work packages.
Contain Work Breakdown Structure Code for each task.
Present duration estimates for each task that results in a duration
estimate for the project not to exceed the requirements described in the
overview.
Deliverable one (1) of your assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman font (size 12), with
one-inch margins on all sides; citations and references must follow
APA or school-specific format. Check with your professor for any
additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the date.
The cover page and the reference page are not included in the
required assignment page length.
The specific course learning outcomes associated with this assignment
are: