CIS 348 All Assignments CIS 348 All Assignments | Page 2
Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites
do not qualify as quality resources.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all
sides; citations and references must follow APA or school-specific format. Check with your
professor for any additional instructions.
Include a cover page containing the title of the assignment, the student’s name, the professor’s
name, the course title, and the date. The cover page and the reference page are not included in
the required assignment page length.
The specific course learning outcomes associated with this assignment are:
Prepare strategies to manage project resources to include human resources, capital equipment,
and time.
Summarize the project procurement process including external acquisition and outsourcing.
Design project execution activities including change control and communicating project status.
Summarize methods to control technology projects through information tracking and cost and
change control techniques.
Evaluate the ethical issues in complex project environments.
Identify and plan communication strategies for project constituents and stakeholders across
global teams and those internal to the organization.
Use technology and information resources to research issues in information systems and
technology.
Write clearly and concisely about Information Technology Project Management topics using
proper writing mechanics and technical style conventions.
Grading for this assignment will be based on answer quality, logic / organization of the paper,
and language and writing skills, using the
CIS 348 Week 2 Assignment 1 The Role of Project
Managers (2 Papers)