Selfproduction |
Authorisation required for electricity projects with an installed capacity equal to or greater than the one set by decree. We have not been able to identify such threshold. This needs to be further investigated with the administration.
Self-production of electricity with sale of surplus is authorised but cannot exceed 50 % of its installed power capacity. The sale of surplus production to an Eligible Client is subject to the authorisation regime regardless of the installed power capacity. 1
|
Authorisations and declarations granted by the Autorité de Régulation de l ' Électricité( ARE) upon demand of the interested party. |
Law No. 2020-50 of 1 April 2020( Electricity Code)
Regulation No. 2023-001 / CNR / ARE relative aux conditions et modalités de déclaration et d ' octroi d ' autorisation pour les installations d ' autoproduction d ' électricité en République du Bénin
|
Declaration required for self-generated renewable energy facilities with a nominal power output of more than 10 KW and less than 100 KW. These thresholds may be too small in practice for captive power projects. |
|||
Authorization required for self-generated thermal power generation facilities with a site installation capacity greater than 500 kVA. |
|||
Authorization required for self-generating renewable energy facilities with a rated power output of 100KW or more. |