Selfproduction |
Authorisation required for electricity projects with an installed capacity equal to or greater than the one set by decree . We have not been able to identify such threshold . This needs to be further investigated with the administration .
Self-production of electricity with sale of surplus is authorised but cannot exceed 50 % of its installed power capacity . The sale of surplus production to an Eligible Client is subject to the authorisation regime regardless of the installed power capacity . 1
|
Authorisations and declarations granted by the Autorité de Régulation de l ' Électricité ( ARE ) upon demand of the interested party . |
Law No . 2020-50 of 1 April 2020 ( Electricity Code )
Regulation No . 2023-001 / CNR / ARE relative aux conditions et modalités de déclaration et d ' octroi d ' autorisation pour les installations d ' autoproduction d ' électricité en République du Bénin
|
Declaration required for self-generated renewable energy facilities with a nominal power output of more than 10 KW and less than 100 KW . These thresholds may be too small in practice for captive power projects . |
|||
Authorization required for self-generated thermal power generation facilities with a site installation capacity greater than 500 kVA . |
|||
Authorization required for self-generating renewable energy facilities with a rated power output of 100KW or more . |