Site Planning
Your Completed
Playground Site Plan
Planning Your Site
Using images of your actual site, our design team will work
Should you choose our NPSI certified Installation Team to install
with you to incorporate your playground into your existing
your playground, you will be provided with a 2D CAD of your
property. From preparing the space, to planning and
entire playground as it will appear in relation to your existing site.
installing proper drainage, our CPSC Certified Playground
You will be assigned a dedicated Project Manager who will assist
Designers will help you plan your site in detail.
you throughout the final stages of planning and installation.
Things to Keep in Mind:
• Location of existing structures
• Location of nearby trees and overhanging limbs
•
•
•
(Must be 8” above highest playable surface.)
Local codes and ordinances
Location of underground utilities
Nearest available electrical outlets and faucets
Project Timeline:
• Finalized site plan
• Delivery of project packet
• Pre-Installation conference
• 1 Week prior to install: final timeline confirmed
• Install begins
• 24 Hours prior to completion: substantial completion
• inspection
• Immediately after install: Substantial Completion Inspection
• 30 Days after final completion: Playground Operations and
• Maintenance Package
Here is a Top View of the Completed
Custom Structure