B & I Report Malaysia
Sime Darby Property Bhd:
AZALEA @ NILAI IMPIAN (PHASE NU6B2), NILAI, NEGERI SEMBILAN, MALAYSIA
PROJECT REF. 0216-6634
CLASSIFICATION Residential
STAGE OF PROJECT Siteworks
LOCATION Phase NU6B2, Lot PT 24369, Mukim Setul,
Daerah Seremban, Nilai, Negeri Sembilan,
Malaysia
(Coordinates: 2.835052,101.800612)
APPROX. PROJECT COST RM65 million
APPROX. COMMENCEMENT DATE 4Q 2015
APPROX. COMPLETION DATE 4Q 2018
C & S ENGINEER
Srtuctural engineer:
Khairi Consult Sdn Bhd
No 76, Jalan SG 4/8
Taman Seri Gombak
68100 Batu Caves, Selangor, Malaysia
Tel: +603-6184 1652 / 53 / 6186 9528 / 29
Fax: +603-6184 1654
E-mail: [email protected]
Sr Engineer: En Mazlan Bin Montah
DEVELOPER
Sime Darby Property Bhd
Jalan Nilam 2
off Jalan Mutiara
71800, Nilai Negeri Sembilan, Malaysia
Tel: +606-794 1040 / 1041 Fax: +606-794 1039
Development Executive: En Sharif bin Ahmad
Civil engineer:
Ranhill Bersekutu Sdn Bhd
Level 23 Suite 2302, Plaza Permata
No 6 Jalan Kampar, Off Jalan Tun Razak
50400 Kuala Lumpur, Malaysia
Tel: +603-2716 8888 Fax: +603-2716 8889
E-mail:[email protected]
Project Director: Ir Lee Chan Moi
ARCHITECT
Neuformation Architect
C-10-05 Block C, Oasis Square
No 2 Jalan PJU 1A/7A, Ara Damansara, PJU 1A
47301 Petaling Jaya, Selangor, Malaysia
Tel: +603-7734 3333 / 2688 / 1788
Fax: +603-7734 3663
E-mail:[email protected]
Project Architect: En Fazli bin Azmi
76 Building & Investment | www.b-i.biz
M & E ENGINEER
Rizal Hood Jurutera Perunding
Lot 83C, Lorong Memanda 1
Ampang Point
68000 Ampang, Selangor, Malaysia
Tel: +603-4251 7460 Fax: +603-4252 3804
E-mail:[email protected]
Engineer: En Mohd Zaidin bin Atan
QUANTITY SURVEYOR
CIC-QS Services Sdn Bhd
Suite F-10-10, Block F
Phileo Damansara 1
9, Jalan 16/11
Off Jalan Damansara
46350 Petaling Jaya, Selangor, Malaysia
Tel: +603-7665 9001 Fax: +603-7945 6864
Quantity Surveyor: Puan Yusliza Binti Parlan
MAIN CONTRACTOR
Idaman Ikhlas Sdn Bhd
Level 9 Wisma Wiramas
No 1 Jalan 2/109E
Taman Desa
Jalan Klang Lama
58100 Kuala Lumpur, Malaysia
Tel: +603-7972 3388 / 3199 Fax: +603-7971 9725
Managing Director: Mr Chong Thin Choy
BRIEF DESCRIPTION
Proposed project involves the construction and completion
of 178 units of double-storey link-houses (88 units are of
lot sizes of 22’ by 74’ and 90 units are of lot sizes of 24’
by 74’).