Brochure Shuttle EN 11-2022 -kl | Page 4

Assembly
Assembly
The Shuttle and tower are assembled simultaneously . The base section of the Shuttle is installed after the base of the tower has been erected . Always ensure that the shuttle and tower are mounted spirit-level . Then the console slides downwards over the base section . A guide section is installed following each assembly step . When using the Solar panel , the Solar frame has to be installed after the last section is installed .
The winch is put onto the last section . The strap will be lowered by putting the cordless drill onto the winch and turning it clockwise . Subsequently , the strap can be attached to the console . Turning the cordless drill counter-clockwise , the console is hoisted .