• Advising US EXIM, JBIC, NEXI, KEXIM, K-Sure and other financial institutions on the $ 7.2 billion package of funding for the $ 10 billion Roy Hill integrated mine, port and rail project in the Pilbara, Western Australia.
• Advising the Egyptian Refining Company and its shareholders on the ongoing project financing of the $ 4.2 billion hydrocracker project at Mostorod, Cairo, Egypt, including a restructure of its project financing in 2018 which involved an additional $ 500 million in loans and equity. The lenders to ERC include JBIC, NEXI and K-Exim.
• Advising the State of Papua New Guinea on aspects of the Exxon-led US19b PNG LNG project financing, which includes US Exim, JBIC, CEXIM, NEXI, SACE and EFIC( now Export Finance Australia) as lenders.
• Advising JBIC, NEXI, K-Exim and K-sure on the US $ 4 billion financing for the construction of the 2650 MW oil-fired Jeddah South Power Project in Saudi Arabia.
• Advising K-Exim and other financial institutions in connection with the US $ 24.4 billion financing of the Barakah 4,800 MW Nuclear Power Project in the UAE Advising K-Exim, K-sure, COFACE( now Bpifrance), US Exim, UKEF, Euler Hermes and other financial institutions in connection with the US $ 12.5 billion financing for the Sadara Integrated Petrochemicals Project in Saudi Arabia.
• Advising K-Exim, and other financial institutions on multiple award-winning expansion financings of Reliance Industries Limited’ s Jamnagar Petrochemicals Project in India.
• Advising K-Exim and K-sure in connection with multiple award-winning US $ 750 million financing for Reliance Jio 4G Telecom in India.
• Advising a national oil company in relation to its K-EXIM buyer credit facilities.
• Advising US EXIM, JBIC, NEXI, K-Exim K-Sure and other financial institutions on the $ 7.2 billion package of funding for the $ 10 billion Roy Hill integrated mine, port and rail project in the Pilbara, Western Australia.
• Advising the Egyptian Refining Company and its shareholders on the ongoing project financing of the $ 4.2 billion hydrocracker project at Mostorod, Cairo, Egypt, including a restructure of its project financing in 2018 which involved an additional $ 500 million in loans and equity. The lenders to ERC include JBIC, NEXI and K-Exim.
• Advising K-Exim, K-sure and other financial institutions in relation to a US $ 1.5 billion project financing for the construction of the Rabigh Phase 6 700 MW Thermal Power Project in Saudi Arabia.
• Advising JBIC, NEXI, K-Exim and K-sure on the US $ 4 billion financing for the construction of the 2650 MW oil-fired Jeddah South Power Project in Saudi Arabia.
• Advising a national oil company in relation to its K-EXIM buyer credit facilities.
• Advising K-sure, COFACE( now Bpifrance), US Exim, UKEF, K-Exim, Euler Hermes and other financial institutions in connection with the US $ 12.5 billion financing for the Sadara Integrated Petrochemicals Project in Saudi Arabia.
• Advising K-sure, UKEF, COFACE( now Bpifrance) and other financial institutions on multiple award-winning expansion financings of Reliance Industries Limited’ s Jamnagar Petrochemicals Project in India.
• Advising K-sure and K-Exim in connection with multiple award-winning US $ 750 million financing for Reliance Jio 4G Telecom in India. bracewell. com