B UILDING & M ANAGEMENT V OLUME 3 I SSUE 2 M AY - A UGUST 2019 A N IMPROVEMENT IN CONSTRUCTION PLANNING : L AST P LANNER S YSTEM ® M. A. Á LVAREZ P ÉREZ , M. S OLER S EVERINO AND E. P ELLICER A RMIÑANO (2019). B UILDING & M ANAGEMENT , 3(2): 60-70 del PERT no parte de estadísticas sino de datos con un grado razonable de precisión, tanto en cuanto a los tiempos como a la asignación de recursos para las actividades (Figura 5). Therefore, it is oriented to activities and not to time, it was also created in the United States in 1957, parallel to the PERT, although in this case were private companies: Dupont and Remington Rand, which commissioned the design to experts, the intention was to control the costs more than the term of production, and for that reason it was designed in a more demanding way in that matter. Por tanto, se orienta a las actividades y no a los tiempos, fue creado también en Estados Unidos en el año 1957, paralelamente al PERT, aunque en este caso fueron empresas privadas: Dupont y Remington Rand, las que encargaron el diseño a expertos, la intención era controlar los costos más que el plazo de la producción, y por ello se diseñó de forma más exigente en esa materia. Fig.5: Diagrama CPM (Fuente: Escuela de Organización Industrial, 2013) / CPM diagram (Source: Escuela de Organización Industrial, 2013) Al utilizar datos determinísticos, nos conduce a resultados ciertos, no probables como el PERT, en consecuencia, es un método no ectocástico y por tanto aplicable a la construcción. No obstante, su uso en esta materia también es limitado. When using deterministic data, it leads us to certain results, not probable as the PERT, consequently, it is a non-stochastic met- hod and applicable to the construction. However, its use in this matter is limited. 6. E L S ISTEMA DEL Ú LTIMO P LANIFICADOR 6. T HE L AST P LANNER S YSTEM ® No obstante, los métodos clásicos de planificación de obras descritos anteriormente son inadecuados para las necesidades actuales, y se producen anomalías en su uso. However, the classical work planning methods described abo- ve are inadequate for current needs and anomalies in their use occur. “¿Por qué se producen estas anomalías?: "Why do these anomalies occur? - Se diseñaron hace 70 años con la tecnología de hace 70 años. - They were designed 70 years ago with the technology of 70 years ago. - Los algoritmos de cálculo de los grafos están muy relajados. - The graph calculation algorithms are very relaxed. - No consideran situaciones reales de los proyectos. - They do not consider real situations of the projects. - No consideran un enfoque sistémico del proyecto. - They do not consider a systemic approach to the project. - No consideran que los proyectos son sistemas productivos. - They do not consider that the projects are productive sys- tems. - No consideran que los proyectos los hacen personas” - They do not consider that the projects are made by people " (Ponz Tienda, 2017) (Ponz Tienda, J.L., 2017) “Hacen falta métodos de análisis de las matemáticas, adaptados para encajar Sistemas que contienen Seres Humanos” "Mathematical analysis methods are needed, adapted to fit Systems containing Human Beings" (Goldratt, E.M. 1997) (Goldratt, Eliyahu M. 1997) 65