e
equir
36" r *
e
v
o
*
b
ork a
actor
asew ral contr
c
r
o
e
lls
en
m wa
the g
g fro done by
n
u
h
work the walls
l case
** Al locking in
b
-03
MW
T-10
4
CH-0
New Science and Technology
Center Set to Open This Winter
k abov
e 3
al cont 6" requires
ractor
**
6
-04
MW
The new center, under construction in the
former site of the ‘Waterview’ dormitories, will
contain six centrally located, state-of-the-art
laboratories (three for science and three for
computer courses). The labs will benefit the
elementary school, middle school, and Mesivta
Chaim Shlomo talmidim, enhancing their stellar
general studies curricula. The new center is
being underwritten with generous assistance
from the Gruss Life Monument Funds and is
projected to open in January, 2020.
-03
MW
T-09
-07
MW
-08
MW
T-07
CH-02
T-05
T-05
T-08
DIV-1
CH-03
** All ca
sework
hung
blockin
g in the from walls or
casewo
walls d
one by
rk above
the gen
36" re
eral co
ntracto quires
r **
BEDARCHEI HATORAH
WINTER 5780/2020
17