Bedarchei HaTorah Winter 2020 | Page 19

e equir 36" r * e v o * b ork a actor asew ral contr c r o e lls en m wa the g g fro done by n u h work the walls l case ** Al locking in b -03 MW T-10 4 CH-0 New Science and Technology Center Set to Open This Winter k abov e 3 al cont 6" requires ractor ** 6 -04 MW The new center, under construction in the former site of the ‘Waterview’ dormitories, will contain six centrally located, state-of-the-art laboratories (three for science and three for computer courses). The labs will benefit the elementary school, middle school, and Mesivta Chaim Shlomo talmidim, enhancing their stellar general studies curricula. The new center is being underwritten with generous assistance from the Gruss Life Monument Funds and is projected to open in January, 2020. -03 MW T-09 -07 MW -08 MW T-07 CH-02 T-05 T-05 T-08 DIV-1 CH-03 ** All ca sework hung blockin g in the from walls or casewo walls d one by rk above the gen 36" re eral co ntracto quires r ** BEDARCHEI HATORAH WINTER 5780/2020 17