BDC Magazine - Online version December 2015 Issue - 216 | Page 86

PMC.qxp_feature 2 23/10/2015 10:48 Page 84 HEALTH & SAFETY: PMC CONSTRUCTION The relationship PMC builds with clients breeds long-term partnerships which has in turn solidified the company’s reputation, but ultimately, it’s about being able to deliver the right solution. This has enabled PMC to tackle a comprehensive range of projects from new builds to refurbishment and restoration. For example, an interesting contract captured by PMC was for the redevelopment of a former ec clesiastical structure at Eastleigh in Hampshire. The original building was constructed using the outer stone facing, inner brick skin with rubble/grout fill method. The brief was to retain all of the existing structure whilst erecting a wholly new steel frame within the physical constraints of the existing building. The challenge was in isolating all of the new loadings from the existing structure and at the same time maximising the internal space available. One of the central features is a light well that provides natural light from the upper “The relationship PMC builds with clients breeds long-term partnerships which has in turn solidified the company’s reputation” tracery windows down to the ground floor ments in the vaulted crypt area. potential clients. communal areas. There are also viewing In concert with PMC’s client, it pro- Elsewhere, PMC’s various projects windows around the gallery that serve the vided much appreciated site access and highlight the successful relationships it has flat entrances bringing much needed natu- information to interested parties during had with some clients over the last few ral light to the ground floor, whilst at the development. The client experienced a decades. For example, the Heritage same time lifting the inner environment of great deal of demand for the units and Business Park in Gosport represented a 20- the upper floors. the project was oversubscribed by peti- year relationship between contractor and tioners seeking residency. client. The business park development was- The project consists of 25 flats of mixed design that incorporate as many internal The impressive stance of the building n’t easy, requiring well considered design elements in their fabrics as possible. An along with its high specification had and good quality construction to overcome example of this was the use of the large already assured a successful project, but the challenge of the location. tracery windows in the apse areas and the the interest generated enabled PMC to The units themselves are steel frames retention of large structural timber ele- further showcase its talents to other with various styles of cladding and external 84