BDC Magazine - Online version December 2015 Issue - 216 | Page 71

Briton.qxp_feature 2 20/10/2015 11:09 Page 69 BUILDING WITH STEEL: BRITON FABRICATORS Demand has continued to increase. A new extension in 2007 was added for use as a prep shop, and in 2014 extensions were added to the main fabricating bays taking them from 32 metres to 56 metres in length. Today, Briton has one of the largest manufacturing facilities in the country dedicated to infrastructure engineering. Its plant in Nottingham provides over 2900m² of covered, fully serviced fabrication workshops and has access to 3600m² of specialist protective treatment facility. In addition, its CE Marking accreditation to Execution Class 4 allows it to tackle anything the infrastructure sector can throw at it, making Briton a vital asset to the industry. 20%, its onsite staff by 50%. This is in addi- Briton also remains active in sectors of This is in addition to other vital accreditations tion to its ongoing dedication to apprentice- key strength – rail station footbridges, such as RQSC for bridgeworks and LINK- ship schemes where it currently has trainees motorway sign structures including portal UP for its work as a supplier to the UK rail in estimating and drawing with ambitions and cantilever gantries, plate girder road network. It is also a full member of the British to increase this intake. This sees Briton cur- bridges, rail decks and its increasing Constructional Steelwork Association. rently employ around 85 people in total. involvement in the construction of over- Indeed, over the last few years, the busi- The result of its success means the busi- head line structures. Highlighting its ness has enjoyed significant growth. In less ness is increasingly busy across the UK. For expertise, the company won a BCIA award than a decade it has turned over £100m example, it’s currently working on a major for its work in Derby for a swing bridge worth of infrastructure work, almost project in the North West for Mersey link, over the river Derwent which has the ability tripling its own turnover since 2007. The fabricating and soon to be installing a 65- to swing shut in the event of a flood, pro- workforce on the shop floor has risen by metre span arch pedestrian footbridge. tecting this asset from damage. 69