Arlington Municipal Airport Development Plan Arlington Airport Development Plan | Page 237
AIRPORT DEVELOPMENT PLAN
Short Term Planning Program (1-5 Years)
Long Term Planning Program (6-10 Years)
1 E
Expand Terminal Aircraft Parking Apron
1 Reconstruct Taxiway D to Meet TDG 3 Standards / Relocate Hold Line 12 Construct Terminal Aircraft Parking Apron on West Side of Airport - Phase I
2 R
Realign Taxiway H at Intersection of Runway 16-34 2 Reconstruct/Rehabilitate Taxiway C to Meet TDG 3 Standards - 50' wide / Relocate Hold Line 13 Extend Runway 16-34 and Parallel Taxiways A and G 700' North /
3 R
Reconstruct South Aircraft Parking Apron 3 Reconstruct/Rehabilitate Taxiway E to Meet TDG 3 Standards - 50' wide / Relocate Hold Line 4 R
Rehabilitate Portions of Runway 16-34 (General Pavement Maintenance) 4 Reconstruct/Rehabilitate Taxiway F to Meet TDG 3 Standards - 50' wide / Relocate Hold Line 5 I Implement Drainage Improvements on South Side of Airport 5 Implement LED Technology on Airfield Lighting and Signage (Not Pictured) Displace Runway 16 Threshold 700'
14 Relocate Taxiway J from the Runway High Energy Area - 50' wide
15 Conduct General Pavement Maintenance (Not Pictured)
6 C
Construct Perimeter Access Roads on North, South, and West Sides of Airport 6 Construct T-Hangar Facility and Taxilane Access in Southeast Development Area - Phase II 7 Implement Drainage Improvements on East Infield Area 7 Redevelop City T-Hangar Area (Remove T-Hangars / Reconstruct Aircraft Parking Apron)
8 Reconstruct Taxiway A to Meet TDG 3 Standards - 50' wide / Relocate Hold Lines 8 In-Fill Apron Areas Adjacent to East Side of Taxiway A / Construct No-Taxi Island
9 Rehabilitate Taxiway A1 9 Construct Rotorcraft TLOF Facility
10 A
Acquire Land for Approach Protection in North RPZ (1.68 Acres) 10 Construct Box Hangars in Northeast Development Area
11 C
Construct T-Hangar Facility and Taxilane Access in Southeast Development Area - Phase I 11 Construct Airport Maintenance Facility and Staging Area
16 Conduct Miscellaneous Annual RAMP Projects (Not Pictured)
Ultimate Term Planning Program (10+ Years)
Acquire Land for West Side Vehicle Access Road Right-of-Way (0.28 Acres)
1 A
2 C
Construct West Side Vehicle Access Road from Center Street Extension
3 C
Construct Terminal Aircraft Parking Apron on West Side of Airport - Phase II
4 C
Construct Aircraft Wash Rack on West Side of Airport
12 Reconstruct Runway 16-34
Conduct Miscellaneous Annual RAMP Projects (Not Pictured)
13 C
6
South Collins St.
3
6
11
LED - Light Emitting Diode
TLOF - Touch-Down and Lift-Off
8
G
J
4
Airport Property Line
11
LEGEND
2
G
Osprey Dr.
Center Street Extensio n
1
N
NORT
NO
NORTH
H
0
800
2
6
610
Approach RPZ
ay G
T axiw
ATCT
0
58
12
6
Chapter Six - 9
Departure RPZ
ATCT
oad to
R
s
s
e
Ac c
H
13
13
12
A
10
D
E
F
8
13
a y A
T axiw
B
7
A 1
5
C
A
8
7
0
7
1
5 6
10
TDG - Taxiway Design Group
RPZ - Runway Protection Zone
RAMP - Routine Airport Maintenance Program
1600
Avigation Easement
35’ Building Restriction Line (BRL)
Runway Protection Zone (RPZ)
Flood Plain
Terrain Contours
Short Term Development
Long Term Development
Ultimate Term Development
Private Development/Beyond Planning Period
Aviation Reserve
SCALE IN FEET
Aerial Date: 7/12/14
Exhibit 6B
DEVELOPMENT STAGING