Arlington Municipal Airport Development Plan Arlington Airport Development Plan | Page 149

    REVIEW OF PREVIOUS AIRPORT PLANS    The  previous  Master  Plan  for  Arlington  Municipal  Airport  was  completed  in  2008  during  the  master  planning process.  The resulting Airport Layout Drawing (ALD) was approved by the FAA and TxDOT in  June 2009.  The ALD is shown on Exhibit 4A.    The  2008  Master  Plan  recommended  airfield  improvements  to  include  extending  Runway  16‐34  to  6,780 feet, increasing runway pavement strength to 120,000 pounds dual wheel loading (DWL), con‐ structing  a  parallel  taxiway  on  the  west  side  of  Runway  16‐34,  and  installing  navigational  aids  to  in‐ clude a medium intensity approach lighting system with runway alignment indicator lights (MALSR).  In  addition, the Master Plan called for the construction of a new terminal building with associated aircraft  parking apron space (and removal of existing building), and the allowance for additional hangar facility  construction.      Since the time of these recommendations, significant investments have been made at Arlington Munic‐ ipal Airport to include:     A redeveloped terminal area that includes a new terminal building and associated vehicle parking.   A partial parallel taxiway (Taxiway G) constructed on the west side of Runway 16‐34.   The implementation of a MALSR on Runway 34.   Landside development in the form of additional hangars and access taxiways on the east side of the  Airport.   The reconstruction and/or rehabilitation of runway and taxiway pavements.    The analysis presented in this chapter will revisit the recommendations presented in the previous Mas‐ ter Plan and included on the current ALD.  Since completion of the last plan, the FAA has made some  significant modifications to airport design standards as outlined in the previous chapter.  As such, some  of  the  previous  plan’s  elements  may  be  carried  over  to  this  Development  Plan  and  others  may  be  changed and/or removed from further consideration.      AIRPORT PLANNING CONSIDERATIONS    The development alternatives are categorized into two functional areas: airside and landside.  Airside  considerations  relate  to  runways,  taxiways,  navigational  aids,  lighting  and  marking  aids,  etc.  and  re‐ quire the greatest commitment of land area to meet the physical layout of the Airport as well as the  required airfield safety standards.  The design of the airfield also defines minimum set‐back distances  from  the  runway  and  object  clearance  standards.    These  criteria  are  defined  first  to  ensure  that  the  fundamental needs of the Airport are met.  Landside considerations include hangars, aircraft parking  aprons, terminal services, as well as utilization of remaining property to provide revenue support for  the Airport and to benefit the economic development and well‐being of the regional area.      Chapter Four - 3