Architect and Builder Sep 2021 | Page 28

BASEMENT P1 BASEMENT P2
GROUND FLOOR
• Backup electricity provided by means of diesel generator .
• Indigenous landscaping and drip irrigation
• Domestic back up water : 2 days
• Performance glazing : double glazed northern façade with low E performance glazing .
• Glass balustrades to central atrium : encourages use over lifts
• Building services on the roof : maximum tenant spaces .
• Pluvia roof drainage
• Opening window sections every 3.6m : natural ventilation and building air circulation
• Sanitary fittings : water wise to minimise consumption
• Low VOC ( volatile organic compounds ) materials
28 Irene Link Building B