THIRD FLOOR PLAN
FIRST FLOOR PLAN and canopy roofs utilise ‘ hidden ’ cantilever beams to enhance and support the aesthetics of the building and the larger precinct . The structural steel feature bridge that connects the two Rewardsco buildings relies on a push / pull effect on the podium slab and the existing building as support . The steel bridge traverses a movement joint on the podium which posed some detail design challenges .
MECHANICAL OVERVIEW Basement The basement parking serving the entire office park is naturally ventilated . A new section of basement for Block B was constructed which restricted good ventilation , so ‘ Shunt-Fans ’ were installed to improve the situation . They are also used for smoke clearance in the event of a basement fire .
GROUND FLOOR PLAN
748 Rewardsco 2