the parking at the Illovo Edge Phase 3 building have been kept at a minimum in terms of local authority requirements .
Provision has also been made for 16 parking bays for fuel efficient vehicles and 18 parking bays for motorbikes or scooters .
Well fitted cyclist facilities including dedicated showers are also provided in the basement of the building .
Environmental Protection Waste Management
• Implemented Environmental Management Plan ( EMP ) for pre-construction and construction phases ;
• HVAC refrigerants have Ozone Depletion Potential ( ODP ) of zero ;
• All thermal insulants have zero ODP in both manufacture process and composition ;
• Due to the use of efficient sanitary fittings the discharge to sewer is reduced by 61 %;
• Contractually required Waste Management Plan for construction phases ;
• 70 % of construction waste redirected from landfill to be re-used or recycled ;
• Provision of recycling waste storage on basement level 1 .
Conclusion Illovo Edge Phase 3 represents the completion of the vision for a top quality precinct whose buildings inter-relate to form a cohesive development , whilst still retaining their own individuality and style .