meetings with the main contractor , Legocon Projects , to resolve difficult junctions on site . The total construction period was 12 months , including the interior fitout .
Resolving the ceiling services was a major undertaking and rivalled previous challenging projects on which the experienced team had worked . Many green design elements were
incorporated into the design . Rain water is harvested from the downpipes and stored in 30,000 litre tanks for use for flushing toilets in the building and for irrigation around the site .
Solar geysers were installed and geysers re-used where possible . A mixed HVAC system was installed to cater for specific client requirements , with VRV energy efficient plant in general .