KPMG PHASE II

KPMG PHASE II East Campus , Parktown
CLIENT Old MutuaI Property
ARCHITECTS Impendulo Design Architects
QUANTITY SURVEYORS AECOM
CIVIL & STRUCTURAL ENGINEERS Ndodana Consulting Engineers
ELECTRICAL ENGINEERS CKR Consulting Engineers
MECHANICAL ENGINEERS SPN Consulting Engineers
FIRE CONSULTANTS TWCE
SUSTAINABILITY CONSULTANTS Zutari
PROGRAMME MANAGEMENT Orion Project Managers
INTERIOR DESIGNER Plan IA
LANDSCAPE ARCHITECTS Red Landscape Architects
HEALTH & SAFETY SHEM
MAIN CONTRACTOR Stefanutti Stocks

The first phase involved the extensive refurbishment of the Wanooka ( House ) a heritage building dating back to 1899 and was completed in 2010 . KPMG required a design that was sympathetic to their West Campus while respecting the heritage building Wanooka and the urban scale of the ‘ gateway ’ to the City , formed between the present West Campus and new East Campus .

While creating something with a signature and presence for the Client , it has been important to those residents in the neighbourhood that the low rise ‘ office park ’ feel in the area be retained .
Phase II of the KPMG East Campus has now been completed and Phase III has commenced on site . KPMG required 24,000m 2 of campus style office buildings using similar design and planning principles used at their recently completed building in Canary Wharf , London . The project required land assembly and land swaps with the City Council of Johannesburg .
Land Use Challenges and Building of the Bridge Link The land compilation for Phases II and III of the buildings was technically challenging . Firstly , an important component of the building is the bridge link
Phase II provides 11,820m 2 of offices with further executive entertainment facilities and 563 basement parking bays over 5 basement levels
212 KPMG Phase 2