As the precinct comprises mixed uses
which have peak energy demands at different
times of the day, feasibility investigations
suggest that a tri-generation plant to
produce energy for the precinct would be
advantageous. Ongoing investigation and
more detailed planning and feasibilities are
currently underway.
The aim is to create a variety of different
tenant mixes across several occupancy
types. In addition, a layered legacy of the
inner city will be reflected in the overall
democratic armature/ skeleton of Kgoro, with
its fascinating embellishments particular to
each building.
PROFESSIONAL TEAM:
Client: Regiments
Project Managers: Pro-Crit; Triviron
PROFESSIONAL DESIGN TEAM
(PRECINCT):
Architects and Urban Designers:
StudioMAS Architecture & Urban Design
Retail specialist: Actio
Quantity Surveyors: KDM
Structural Engineer:
Pure Consultants
Electrical Engineer: CAI
Mechanical Engineer:
WSP | Parsons Brinckerhoff
Fire Protection: Building
Code Consultants
Wet Services: Phumaf
Sustainability: PJC
PROFESSIONAL DESIGN TEAM
(BUILDINGS – PHASE 1):
Architects and Urban Designers:
StudioMAS Architecture & Urban Design;
LYT Architects
Quantity Surveyors: Aecom
Structural Engineer:
Pure Consultants; Asakheni
Electrical Engineer: CAI;
Aftek Consulting
Mechanical Engineer:
WSP | Parsons Brinckerhoff
Fire Protection:
Building Code Consultants cc
Wet Services: Phumaf; Rivingo
Sustainability: PJC
Rollerstyle
Project Watch
19