Architect and Builder Oct/Nov 2017 | Page 22

PROJECT FEATURE BCX HEAD OFFICE BCX HEAD OFFICE Centurion CLIENT BCX HQ Offices Co-ownership JV PROJECT MANAGER & PRINCIPAL AGENT JSA & Associates Project Management R.O.M. ARCHITECT SVA International QUANTITY SURVEYORS DelQS in a JV with PMPlus CIVIL & STRUCTURAL ENGINEERS Bigen Africa Group Holdings PDS Civil Engineers ELECTRICAL ENGINEERS Quad Africa Consulting Moditi Consulting Engineers MECHANICAL ENGINEERS Spoormaker & Partners Inc Dientsenere Tsa Meago FIRE PROTECTION ENGINEERS Ingplan Mechanical Consulting Engineers WET SERVICES GIBB VERTICAL TRANSPORTATION CONSULTANTS Projitech SUSTAINABILITY CONSULTANT WSP LANDSCAPE ARCHITECTS Uys & White INTERIOR DESIGNER & SPACE PLANNER dsgn design S outh African information and technology group, Business Connexion (BCX), wanted to construct a new headquarters, consolidating their various offices across Gauteng. Their brief to architects SVA International was to create an iconic & contemporary building accommodating 36,000m 2 of GLA including offices and a warehouse of 2,500m 2 . Parking was to be maximised. The building was to contain client engagement and function areas as well as various showroom aspects to allow BCX to display their IT vendor offerings to clients. Site The site is located in Centurion, on the corner of John Vorster Drive and Lenchen Avenue. It lies adjacent to Centurion Mall and falls within a short distance of the Centurion Gautrain Station and numerous multi-occupant modes of public transport, making it easily accessible and highly visible in the surrounding urban fabric. The BCX headquarters is the first building to be constructed in a larger development master plan for the vacant land between the Centurion Mall and John Vorster Drive. The development master plan allows additional commercial development as well as public spaces and amenities to be developed on this key piece of vacant land, thereby strengthening the Centurion CBD as a commercial HUB. Access to the site is both off Lenchen Ave & South Street, allowing staff, visitor and delivery access to be assigned to different entrances for efficient vehicular flow through the site. Pedestrians gain access at either of the two entrances. Locating the building on the site presented many challenges due to the dolomitic conditions of the Centurion area. There were two large category seven sink hole areas on the site that are located close to the main road intersections of John Vorster & Lenchen Avenue as well as Lenchen Avenue & South Street. This forced the building to be located towards the back of the site and informed the angular geometries of the plan as the building ‘wrapped’ itself around these sink hole zones. The remaining portions of the site allowed for pockets of parking to be separated into visitor and staff parking areas which in turn informed the entrance locations to the buildings. MAIN CONTRACTOR Murray & Roberts Building in a JV with Fikile Construction PHOTOGRAPHY Graham de Lacy 22 BCX