Architect and Builder Magazine South Africa July/August 2014 | Page 25

At 139m tall, with a gross construction area of 114,547m2 over 32 floors, Portside offers over 57,000m² of rentable area Surveyors in the preparation of the Principal Contract Conditions of Contract as well as the selected subcontractors Conditions of Contract, thus ensuring that all the necessary applicable requirements were clearly identified in the tender documentation. This provided the contractor with as detailed as possible knowledge of the building in order to allow a competitive tender outcome to take place. The progress made in relation to the programmes was carefully monitored in order to achieve the objective of the bulk earthworks and lateral support commencement in August Portside 2011, followed by the commencement of the Principal Contractors works scheduled for November 2011. The client’s decision to proceed with the Design and As-built Green Star applications to the Green Building Council South Africa required an approach by the various consultants to address their designs, informing the tender documentation at an early stage. This was significantly ahead of when the actual appointment of the subcontractor would have been required in terms of the construction programme, this programming necessitated by the need 25