Architect and Builder June/July 2018 | Page 45

open parking area as well as three entrance points to the 2-levels of basement parking, covering the entire site of 3,3ha. Apart from the central position of the open air sunlit piazza with intense landscaping, water feature and performer stage with an oversized digital screen, all pedestrian routes culminate in the ‘Pool of Light’ allowing vertical transportation from the basement with oversized glass lifts and escalators to the piazza. This was explicitly done to ensure public awareness of all retail outlets as well as pedestrian traffic to office building entrances, the hotel main entrance and access to the gymnasium, enhancing the vibe of movement. The heritage aspect (apart from the already discussed Sin Bin building) is further emphasised by four axes into the development culminating in the Piazza and focused on pedestrian flow and public approach. These axes are nominated as Sport from the South (Loftus Versveld); Residential from the West, linking the Clydesdale residential area; Art from the Northwest and Education from the Northeast. All restaurants link directly with the Piazza with visibility to the performer stage and digital screen and offer different entertainment a nd food offerings. Office space is provided in the office buildings situated to the North and East of the Piazza and their respective main entrances leading from the Piazza. The hotel features a foyer and public space as a ‘walk through’ experience from the porte-cochère on the West to a spilling out area onto the Piazza to the North. Loftus Park The entire planning concept is focused on move- ment convenience, experience and awareness of nature. Emphasis is also placed on the introduction of several art interventions in specific locations through the precinct to enhance the public awareness of this exclusive precinct. Future phases of 20,000m² are in a design stage accommodating other uses such as medical, resi- dential and additional office space. Development Challenges Development challenges experienced started with the rezoning application due to the fact that the current zoning was agricultural, and the land was donated by the City Council to the area for sport development. This exercise took a long time before approval was finally granted. An extensive amount of ground water was encountered when test holes were done to determine the geotechnical properties of the ground which was rerouted and pumped into the storm water network. A considerable amount of the water is stored below the lowest basement floor and used for landscaping, etc. The main challenge was to obtain buy-in from the surrounding areas on the density, height and architectural expression of the development. After numerous presentations and proposals to all the neighboring stakeholders, the development was approved, and construction could commence. Already mentioned was the issue surrounding the heritage components, but fortunately all 45