Architect and Builder June 2017 | Page 65

THIS PAGE: The Guest Suites (Die Skuur) Formwork: As there is no benchmark or similar structure for this unique shape/form, all the formwork for this project was purpose made. The entire formwork structure was designed as a truss-system and all trusses were pre-manufactured and assembled on site. The formwork process took almost five months to construct on site. Reinforcing: Due to this unique form, each reinforcing bar (top and bottom) had to be individually cut and hand bent / shaped to fit. Concrete / Shotcrete: All the shotcrete / concrete work had to be done from mobile Bosjes Estate platforms. Extreme weather conditions were experienced during the shotcrete process and there were many delays due to strong winds and rain. As a result the entire shotcrete process took almost six weeks compared to the original allowance of two weeks. Conclusion The Bosjes Estate, in particular the Bosjes Chapel, stands as testament to the vision of the architect, the support of this unique design by a brave client and the expertise and willing- ness to push the boundaries of the entire professional team. 65