Fast track design development and construction
of the main structure ensued, including tenant
specific interior design and installation. The
first tenants, PMSA, moved into the building in
October 2015.
A 5 star green rating was designed for and
achieved, making this the first 5 star green rated
P grade office block to grace the Centurion skyline.
34
ARCHITECTURAL REPORT
Brief
The client brief was to maximise the available bulk
on the land in order to provide sufficient space for
the PPS Group’s Centurion HQ in phase 1, along
with other tenants in the surplus space. Phase 2
would be entirely leased to other tenants. The brief
also involved the creation of a memorable place
PPS Centurion Square