Architect and Builder Jul/Aug 2024 | Page 29

• Side fixed glass balustrade to the central atrium which encourages using the stairs over the lifts ;
• The majority of the building services are in the plant room on the upper level thus maximising tenant space ;
• A syphonic system for roof drainage ;
• All sanitary fittings are fitted with aerators to minimise consumption and have a low flow rate ;
• Low VOC ( volatile organic compounds ) materials have been used throughout ;
• There are opening window sections with restrictor stays every 3,6m to encourage natural ventilation as well as natural cross ventilation .
Conclusion Irene Link Building E marks the continuation of the successful development of premium office buildings within the precinct , with the upcoming Building F marking the successful completion of this node in the near future .
Irene Link 29