fabricators to select UC sections radiussed about the major axis. The Hulabond cladding box adopted the final trapezoidal form. Round tubes were used for the lacing in combination with web plates. With the concept realised and agreed with the architect, the structural team got to work developing a parametric algorithm in the visual programming environment of Dynamo, which works seamlessly with Revit. This was then used to solve the geometry of all of the arches by iterating through the parameters of the sphere, and the arch truss centerlines imported into the global OASYS analyses and REVIT models and ultimately into TEKLA. The internal truss grillage is a simple 6 x 6 grid, allowing the designers some latitude to offer up future-proofing for spot loads at the intersections, as well as providing a sensible patchwork for the arrangement of acoustic lining, services reticulation and suspended acoustic blades above the 3,500 seated auditorium array. Simple IPE purlins set up a bottom angle shelf frame for the acoustic lining and a platform for the Klip-Tite sheeting system. A clamped bracket was devised for all the in-roof services so that post erection drilling or screwing could be prohibited globally. Steel Awards Global buckling considerations paid attention to the arch arrangement, and overall stability, as well as serviceability for pre-cambers, and interim construction step models incorporating temporary support towers to protect the geometry during erection. All the arches end with exactly the same ‘cheese wedge’, terminating on articulating pot bearings designed to resist pull-off (when the wind blows). Architect: Elphick Proome Architects Structural Engineer: NJV Consulting Quantity Surveyors: RLB Pentad; Abakali Project Manager: M3 Africa Consulting Main Contractor: Steffanuti Stocks Building KZN Steelwork & Cladding Contractor: Impact Engineering Steel Erector: CMGC Projects Cladding Manufacturer: Global Roofing Solutions Corrosion Protection: Phoenix Galvanising Paintwork Contractor: Top Coat Fabrication Detailing: Strutech 3D Modelling Corrosion Consultant: T.H.C.P.S. Access Consultant: Façade Solutions Bearing Supplier: Nova Engineering Works Arch Cladding Sub Contractor: Scope of Work 81