Architect and Builder December 2019 | Page 18

PROJECT FEATURE RIDGE 7 RIDGE 7 Ridgeside, Umhlangha DEVELOPER FWJK Developments PROJECT MANAGERS & PRINCIPAL AGENTS FWJK Developments ARCHITECT FWJK Architecture QUANTITY SURVEYOR FWJK Quantity Surveyors CIVIL, STRUCTURAL & WET SERVICES NJV Consulting ELECTRICAL ENGINEERS DBA Consulting Engineers MECHANICAL ENGINEERS Spoormaker & Partners Inc FIRE ENGINEERS Woollatt & Clarke Consulting LANDSCAPE ARCHITECTS Land Art Studio HEALTH & SAFETY CONSULTANTS Comprac Holdings GEOTECH ENGINEERS MSJ Geotechnical MAIN CONTRACTOR Rubro Building PHOTOGRAPHY Karl Beath L ocated within the mixed-use precinct of Ridgeside, Umhlanga, Ridge 7 is a 7,700m 2 , sectional title A-grade office development within walking distance to Gateway Shopping Centre and the surrounding commercial hub of Umhlanga. Ridge 7 is the seventh office building developed by FWJK Developments within the Ridgeside Precinct using the Co-Development at Cost Methodology. Simply put, the co-development at cost is an elementary way of enabling smaller property investors the opportunity of co- investing in prime property development suitable for their specific development appetite. Site and Access Ridge 7 is situated within an urban streetscape on Vuna Close circle. Tongaat Hulett have termed this precinct ‘dynamic urbanism’ with luxury residential units, contemporary offices, hotels and destination retail spaces on offer. This extraordinary location has land which cascades towards the sea and is bordered by a coastal forest ribbon and a natural valley that runs through it. The 40ha asset is being preserved as a green space for the surrounding communities. Ridgeside has been one of South Africa’s fasted growing urban development nodes with direct access to the M41 linking to the N2 and M4 Provincial roads. It is approximately 10km from King Shaka International Airport and 23km from the Durban CBD. The superb sea views and top-end mixed-use precinct makes Ridgeside a desirable location and ideal position for Ridge 7. Ridge 7 is accessed directly off the circle at the end of the central boulevard in Ridgeside. The transition from the paved road onto the paved driveway space is seamless and uninterrupted by kerblines. Cars are directed towards the entrance boom using EAST ELEVATION The external building palette of materials is a combination of Marmoran and full height glazing with stainless steel elements seen on the feature balustrade edges 18 Ridge 7