Architect and Builder August/September 2019 | Page 40

40 P1 BASEMENT GROUND FLOOR this development. The system allows for off-peak cooling which is then stored in glycol-water filled storage vessels. The tanks and heat-pump chiller supply the building with the required cooling during standard tariff times and thus provides a substantial save on energy cost. The majority of building lights have been fitted with motion sensors and all the lights are energy efficient fittings. A Building Management System (BMS) has been incorporated into the building design to actively record and monitor services consumption such as water, electricity and HVAC. Real-time consumption is displayed on a monitoring screen that is located in the foyer of the reception area. Staff and visitors can consciously react to this display during their use of the building. Outside spaces are landscaped to minimise hard- surface and improve building occupant use. Trees on the podiums mimic the cantilever building canopy to the south and allows for everyday shade use. Barloworld Logistics