reducing the total cost of energy usage in an energy
intensive production line. Glazing faces north east
to receive natural light reflecting downwards from
white Lambdaboard roof insulation.
Mezzanine offices for the technical team
overlook production facilities which ensures
that specialist technical staff members are in
54
the immediate vicinity of the actual production
and assembly.
LED lighting installed and equipped with motion
sensors in ablution, office and boardroom areas to
minimise energy consumption. UPS back-up power
including 2 x 800 kVa generators for emergency
electrical supply. A heat-pump installation