PROJECT FEATURE
199 OXFORD
199 OXFORD
Oxford Parks, Johannesburg
CLIENT
Intaprop Investments
PROJECT MANAGERS &
PRINCIPAL AGENTS
Duncan Clark Project Management
ARCHITECTS
GLH Architects
BASEMENT ARCHITECTS
dhk
QUANTITY SURVEYOR
Gro2 Consulting
CIVIL ENGINEERS - ROADS
JG Afrika
CIVIL & STRUCTURAL ENGINEERS
Pure Consulting
ELECTRICAL ENGINEERS
Rawlins Wales
MECHANICAL ENGINEERS
Adaptive Resource Engineers
D
eveloped by Intaprop, 199 Oxford is the first completed building in the Oxford
Parks precinct which is envisaged as a sustainable and cosmopolitan medium-
density urban environment that brings 300,000m 2 of development rights to the
Dunkeld precinct linking Illovo to Rosebank along Oxford Road in Johannesburg. The
precinct will promote a 24h lifestyle with an office, retail, hotel and residential mixed-use
environment. There is a strong emphasis on the design of the public spaces.
The vision for Oxford Parks is to build on the strength and unique energy of Rosebank
to develop, from the outset, a dynamic, vibrant urban lifestyle with a strong pedestrian
focus, located close to public transport offerings. Implementing a soft security policy
without fences, the precinct extends the city in a seamless and fully integrated manner.
Phase 1
The first phase of Oxford Parks is organised around a diagonal division of the site as a
pedestrian extension of Oxford Road, inviting the eye and the pedestrians themselves
into the heart of the precinct. 199 Oxford occupies the south eastern corner of Oxford
Parks and is an office and retail mixed use building of six floors with a gross floor area
(GFA) of 10,035m². The three basement levels are approximately 28,000m 2 in size with
all parking below ground, improving the public environment.
WET SERVICES
IZAZI Consulting Engineers
FIRE ENGINEERS
WSP Africa
SUSTAINABILITY CONSULTANTS
Solid Green Consulting
HEALTH & SAFETY CONSULTANTS
Comprac Holdings
INTERIOR DESIGNERS
Boogertman + Partners
Ink Design Lab
Giant Leap
LANDSCAPE ARCHITECTS
Insite Landscape Architects
TENANT REPRESENTATIVE
Turner & Townsend
MAIN CONTRACTOR
Concor Building
PHOTOGRAPHY
InfrastructurePhotos
The first phase is
organised around a
diagonal division of the site
18
199 Oxford