Curtain walling is set back from the column grid, providing shading for interior spaces. Façade materials were kept stripped back, with the focus on the concrete structure, in keeping with the industrial design elements. Handmade tiles in shades of blue act as focal points on the façade and break up the concrete. The industrial elements of the buildings are also softened by the extensive planting of indigenous plants and trees that abound on the site and anchor the buildings within their environment.
Structural Engineering Zutari provided structural, civil and wet services for the precinct. The project entailed the construction of three parking basements and a podium level. Three of the five proposed office blocks that were constructed extend above the podium level. Provision is made in the design for the extension and construction of the other two office towers.
The three towers consisted of a two storey West Tower, four storey South Tower and seven