Architect
and Builder
APRIL / MAY 2018
|
VOLUME 69
|
ISSUE 2
CONTENTS
APRIL / MAY 2018
|
VOLUME 69
|
ISSUE 2
COVER: GATEWAY WEST | PHOTO BY TRISTAN MCLAREN
DEPARTMENTS PROJECTS
4 EDITORIAL 20 GATEWAY WEST
6 NEWS WATCH
12 PROJECT WATCH
16 FEATURE ARTICLE:
Sustainable Development
in Architecture
82 ADVERTISERS
ADVERTORIALS
52 Avance
64 Regent Lighting
74 Armstrong
NEXT ISSUE
If you were involved on any of the
projects / features in our next issue
and would like to advertise or
The development is the first of the two identical buildings that will frame the
northern piazza and entrance to the Mall of Africa.
32 THE NORVAL FOUNDATION
The Norval Foundation is located in the Steenberg area on the slopes of the
Constantiaberg Mountain, surrounded by vineyards and residential estates.
44 WSP KNIGHTSBRIDGE
Designed by Boogertman + Partners, the design brief from the client, the Emira
Property Fund, was for the phased redevelopment of the previous office complex
of two storey office buildings.
56 CTICC 2
The brief was to double the capacity of the existing CTICC, with the new building
forming a seamless extension to the existing facility.
68 CORNUBIA MALL
Designed by Bentel Associates International, this unique retail development was
conceptualised by the need to provide the KZN North Coast with a differentiated
shopping and leisure experience.
32
contribute material please contact
us on 082 572 4707 or visit our
website: www.archibuild.co.za
UPCOMING PROJECTS
Embassy Towers
Loftus Park
OMEM
The Central / Werksmans INTERIORS
BOOKING DEADLINE 78 THE ROCK RESTAURANT
Thursday 28 June 2018
Contents
Premiere Design Studio was appointed to carry out the architectural design
detailing and implementation co-ordination for the The Rock and Carnelian.
3