ARCHITECTURAL FOCUS
approach that brings design quality, high performance, and environmental responsibility together, setting out a model that can be applied to more sustainable high-rise projects worldwide.
A walk in the city
Wasl Tower functions not as a standalone object, but as an urban node connecting infrastructure, programme, and people.
As the first high-rise of its scale on the west side of Sheikh Zayed Road, Wasl Tower bridges two distinct areas of Dubai: the commercial cluster around Burj Khalifa, and the street-based development of City Walk. As a response to this distinctive location, the design features semi-public zones, shared amenities, and elevated gathering spaces to create opportunities for interaction and engagement. As such, the tower was designed to welcome not only residents, hotel guests, and employees, but also the wider public who can access its seven restaurants and bars.
to the tower via a bridge, enhancing connectivity and creating a cohesive urban experience.
Health, comfort, and operational performance were embedded into the project through a‘ Good for the People, Good for the Environment’ framework developed by Werner Sobek Green Technologies. The result is a building that supports daily life across different user groups and contributes to the ongoing transformation of Dubai’ s ground-level urban experience.
Sustainability, technology, and health to the core The design and construction of Wasl Tower incorporates a range of innovations to improve efficiency and reduce environmental impact. The ceramic fins on the facade reduce solar gain and cooling demand, while solar thermal panels and reflective glazing improve energy efficiency. The tower’ s lighting is also managed through
A central vertical circulation system ensures smooth transitions between programmes, while maintaining operational efficiency and discreetly incorporating back-of-house functions that ensure separation from the public areas of the building. The lift strategy choreographs clear, separate journeys for each programme. Three high speed express lifts stitch together the four primary lobbies – ground, spa, sky, and rooftop – convening the public programme and the hotel arrival at 150 metres. A shared bank of four office and four guestroom lifts occupy a central shaft, while upper level residences use a dedicated group with direct basement access; in total, 17 lifts operate throughout, five of them for service. The parking structure also includes a 1,500 m2 column-free ballroom with a green courtyard that connects directly
ARCHETECH- PAGE 72