FIRE SAFETY & SECURITY
By switching to Damex FR, Oak Construction Projects achieved a 25 % cost saving compared to the original specification, without compromising on safety, quality, or performance.
• Waste Reduction: 600ml adhesive foil system cuts packaging waste by up to 90 %.
• EN 14909:2012 Compliant: Ensures a fully functional and certified DPC
• Bespoke Sizes Available: Reduces waste and delivers cost efficiency, customers only pay for what they need.
Results By switching to Damex FR, Oak Construction Projects achieved a 25 % cost saving compared to the original specification, without compromising on safety, quality, or performance.
Additional benefits included:
• DPC and Cavity Tray was installed earlier in the build program than the original specified material, preventing delays and speeding up delivery of the project.
• Next day delivery and improved site support.
• Reduced material waste and disposal costs, with improved site sustainability.
Conclusion The successful installation of Damex FR on the Bosden Building at Stopford Park demonstrates how innovative, compliant products can deliver both technical assurance and commercial value.
Through early technical engagement and collaborative problem solving, Euro Accessories and Damex FR supported Oak Construction Projects in adopting a modern cavity tray and DPC solution that meets today’ s regulatory demands while delivering measurable cost savings. As the first building completed on this major development, the Bosden Building sets a strong benchmark for the phases that follow.
www. damexfr. com www. euroacc. co. uk www. oakconstructionprojects. com
PAGE 57- ARCHETECH