LIFTS, STAIRS & BALUSTRADES
The Solution Stannah Lifts proposed the installation of three 16-person passenger lifts, each featuring a car size of 1100mm wide by 1750mm deep to accommodate the narrow platforms.
To improve the flow and efficiency of passenger movement, the lifts were designed with through-car entrances, allowing doors to open on both sides. This solution eases congestion by enabling passengers to enter and exit from opposite ends of the lift car, reducing wait times and improving accessibility during peak periods.
To minimise disruption to station operations, all lift installations were carefully scheduled and carried out at once. This coordinated approach limited the duration of the installation, helping the station to remain accessible throughout the installation process.
Results Shortlands station now offers greater convenience for wheelchair users, those with limited mobility or people travelling with heavy luggage, bicycles and pushchairs. The energy-efficient hydraulic lift system with the bespoke car sizing helped to address the space constraints on the platforms.
Peter Stapleton, Southeastern Railway’ s Head of Facilities said:“ This project demanded a high level of coordination between partners due to the narrow platforms, operational site and limited access for deliveries. Through close collaboration, Stannah were able to successfully navigate the logistical hurdles and install passenger lifts within tight and narrow enclosures, enabling step-free access.”
The new passenger lifts now provide step-free access from the station’ s main entrance to each platform, linked by a new footbridge. Prior to these improvement works, access was unavailable to wheelchair users. One lift, located in the car park, provides direct access to the footbridge, while the other two lifts are positioned on the bridge to serve each platform. This integrated design provides stepfree access that now allows passengers to move easily between all areas of the station, supporting more inclusive and efficient travel.
Peter Ford, Project Manager, Major Projects Division of Stannah Lift Services, shares:“ We’ re proud to have enhanced accessibility for commuters at another station, and we continue to work with Network Rail to make more stations accessible for everyone. This project demanded close collaboration with BAM Nutall and Network Rail to coordinate material deliveries within tight space constraints, manage off-peak working hours and ensure the safety of passengers moving through the station. Thanks to the dedication of the entire team, we’ ve successfully delivered another fully step-free station.”
For more information, visit www. stannahlifts. co. uk