Archetech Issue 48 2020 | Page 42

CEPEZED cepezedprojects developed, cepezed and cepezed interior designed and cepezedbouwteam coordinated the construction. There was a close collaboration between the designers and the construction coordinator throughout the complete process with key figures from the design also being part of the implementation team. The cooperation with the external partners is also worth mentioning. With a lot of them, cepezed also often collaborates on other projects. As a result, all parties were already well attuned to each other. For example, the structural advice was provided by IMd and the advice in the fields of installations, building physics and fire safety was provided by Nelissen. The realization was tendered out to various parties such as Voortman, Metsä Wood, iFS, Kuijpers and Qbiq + Schelp Bouw & Interieur for respectively the steel construction, floors, facades, MEP/HAVAC and the fit-up package. This pragmatic approach meant that the implementing parties only had to concentrate on their own expertise. In terms of time, use of materials and financially, this has resulted in a high degree of efficiency. EXAMPLE AT HOME With circular projects such as the Temporary Courthouse in Amsterdam and restaurant The Green House in Utrecht, cepezed previously realized other projects completely designed for circularity. These garnered a lot of publicity and various prizes, such as the Amsterdam Architecture Prize and the public award of the Sustainable Building Awards. With Building Part d(emountable), cepezed now has a circular example of its own manufacture directly at home. Customers and partners only have to look out the window to see how cepezed shapes circularity. ARCHETECH - PAGE 42 Photos: Lucas van der Wee | cepezed TECHNICAL SHEET Project: building d(emountable) Project address: Nieuwelaan 72 , Delft, Netherlands Client: Jan Pesman Project development: cepezedprojects, Delft Architect: architectenbureau cepezed, Delft Interior design: cepezedinterieur, Delft Structural engineering: IMd Raadgevende Ingenieurs, Rotterdam Consultant mechanical & electrical engineering, consultant building physics, sustainability, acoustics and fire safety Nelissen ingenieursbureau, Eindhoven construction coordination: cepezedbouwteam, Delft Contractor steel construction: Voortman Steel Construction, rijssen contractor electrical and mechanical installations: Kuijpers Utiliteit Midden-Noord B.V, De Meern Wood floring: Metsä Wood / De Groot Vroomshoop Contractor glass facades: iFS Building Systems, Waddinxveen Contractor roof: Roof Protection, Arkel Stairs: EeStairs, Barneveld Contractor ceilings and custom interior walls: Schelp Bouw & Interieur, Eersel Wall systems: Qbiq, Alphen aan de Rijn Pantries: AS Projectinrichters, Poeldijk Project duration: September 2016 – December 2019 Building area / plot area: 968 m² gfa / 242 m² Photography: Lucas van der Wee | cepezed Drawings: architectenbureau cepezed  www.cepezed.com