CEPEZED
cepezedprojects developed, cepezed and cepezed interior designed
and cepezedbouwteam coordinated the construction. There was
a close collaboration between the designers and the construction
coordinator throughout the complete process with key figures from
the design also being part of the implementation team.
The cooperation with the external partners is also worth
mentioning. With a lot of them, cepezed also often collaborates on
other projects. As a result, all parties were already well attuned to
each other. For example, the structural advice was provided by IMd
and the advice in the fields of installations, building physics and
fire safety was provided by Nelissen. The realization was tendered
out to various parties such as Voortman, Metsä Wood, iFS, Kuijpers
and Qbiq + Schelp Bouw & Interieur for respectively the steel
construction, floors, facades, MEP/HAVAC and the fit-up package.
This pragmatic approach meant that the implementing parties
only had to concentrate on their own expertise. In terms of time,
use of materials and financially, this has resulted in a high degree of
efficiency.
EXAMPLE AT HOME
With circular projects such as the Temporary Courthouse in
Amsterdam and restaurant The Green House in Utrecht, cepezed
previously realized other projects completely designed for
circularity. These garnered a lot of publicity and various prizes, such
as the Amsterdam Architecture Prize and the public award of the
Sustainable Building Awards. With Building Part d(emountable),
cepezed now has a circular example of its own manufacture directly
at home. Customers and partners only have to look out the window
to see how cepezed shapes circularity.
ARCHETECH - PAGE 42
Photos: Lucas van der Wee | cepezed
TECHNICAL SHEET
Project: building d(emountable)
Project address: Nieuwelaan 72 , Delft, Netherlands Client: Jan
Pesman
Project development: cepezedprojects, Delft
Architect: architectenbureau cepezed, Delft
Interior design: cepezedinterieur, Delft
Structural engineering: IMd Raadgevende Ingenieurs, Rotterdam
Consultant mechanical & electrical engineering, consultant
building physics, sustainability, acoustics and fire safety Nelissen
ingenieursbureau, Eindhoven construction coordination:
cepezedbouwteam, Delft Contractor steel construction: Voortman
Steel Construction, rijssen
contractor electrical and mechanical installations: Kuijpers Utiliteit
Midden-Noord B.V, De Meern
Wood floring: Metsä Wood / De Groot Vroomshoop
Contractor glass facades: iFS Building Systems, Waddinxveen
Contractor roof: Roof Protection, Arkel
Stairs: EeStairs, Barneveld
Contractor ceilings and custom interior walls: Schelp Bouw &
Interieur, Eersel
Wall systems: Qbiq, Alphen aan de Rijn
Pantries: AS Projectinrichters, Poeldijk
Project duration: September 2016 – December 2019
Building area / plot area: 968 m² gfa / 242 m² Photography: Lucas
van der Wee | cepezed
Drawings: architectenbureau cepezed
www.cepezed.com