PERFECT EDGE FINISHING
FOR A PRESTIGIOUS
RESIDENTIAL DEVELOPMENT
Schlüter-Systems provided a variety of trims and movement
joints to ensure a damage-free finish for the tiled walls and floors
of high-end residential project, Landmark Place.
The 280,193sq ft Barratt Homes development has an enviable
position on the north bank of the River Thames, near the iconic
Tower Bridge, and boasts 165 one-bed suites, one, two and three
bed apartments and penthouses across 10 storeys. It replaces
Sugar Quay, a 1970s office building built for Tate and Lyle, which
was purchased by CPC Group back in 2012.
The project was a Foster + Partners scheme delivered by
Broadway Malyan. A six-year process has resulted in stunning
surroundings for those who are lucky enough to have secured
a residence, and Schlüter-Systems’ products provide subtle and
stylish support throughout various formats of matte and polished
porcelain (297 x 297mm, 597 x 597mm, 1197 x 1197mm) and
600 x 600mm marble.